Recuproces Investment BV

Plant 5

Recuproces Investment BV

  • New construction of facility
  • Location: Meer, Belgium
  • By 2024 operational
  • 5 MWe

Electricity off-take

11.5 MWe

Heat off-take

14.5 MW

Feedstock

Agricultural waste

Planning Permission

Permits granted, unlimited (industrial zoning):

Binergy Meer;

Permit: GPBV-code: BE.VL.000002123.INSTALLATION

Installatiefiche/BE.VL.000002123.INSTALLATION

Grid connection

36 kV – starting Aug 2023

Site

John Lijsenstraat, 2321 Hoogstraten, Zoning: Industrial (nijverheid)

Commission

Starting August 2023

Technical Facility Data

PRODUCT

Mass (tons/day)

Mass into (tons/year)

% Share Nutrition

Biomass – Solid

258

94.000

34%

Biomass – Liquid

0

0

0%

Manure – Solid

0

0

0%

Manure – Liquid

107

39.000

14%

Internal Return (Thin Fraction)

385

 

51%

Total Fermenter Input

749

133.000

100%

Required Digestion Volume and Digesters

Digester diameter

26,0

m

Liquid height

7,0

m

Number of digestors

6,0

#

Digester content

22.298

Dwell time

30

days

Organic load

8,49

kg OS/m³/day

Site Parameters

   – Electric power 24/7

11,5

MWe

   – Biomass (annualized)

133.000

ton

   – Organic Mineral Grains (annualized)

29.166

ton

   – Gross margin (annualized)

18.608.827

EUR

   – Range “Green Power” for families

23.174

familie

 

Aerials

Recuproces Investment, John Lijsenstraat,

Meer (Hoogstraaten), Belgium

Recuproces Investment BV