MBV Oijen BV
Plant 4
MVB Oijen BV, Netherlands
- Acquisition of MVB Oijen BV
- Location: Oijen, Netherlands (near Oss, Brabant)
- Capacity: 100,000 tons
- 9 MWe to start in 2023
|
Electricity off-take |
3.9 MW ; total energetic power 24/7: 18.6 MW |
|
Heat off-take |
0 MW (no CHP – Combined Heat and Power facility) |
|
Feedstock |
Currently 72,000 tons; 100,000 tons requested of feedstock |
|
Planning Permission |
Permits granted |
|
Grid connection |
Dutch gas network |
|
Site |
Oijen (NL) [near Oss (NL)], agricultural zoning |
|
Commission |
Starting 2023 |
Technical Facility Data
|
PRODUCT |
Mass (tons/day) |
Mass (tons/year) |
% Share Nutrition |
|
Biomass – Solid |
173 |
63.000 |
34% |
|
Biomass – Liquid |
0 |
0 |
0% |
|
Manure – Solid |
0 |
0 |
0% |
|
Manure – Liquid |
74 |
27.000 |
15% |
|
Internal Return (Thin Fraction) |
255 |
|
51% |
|
Total Fermenter Input |
502 |
90.000 |
100% |
Required Digestion Volume and Digesters
|
Digester diameter |
22,0 |
m |
|
Liquid height |
7,8 |
m |
|
Number of digestors |
5,0 |
# |
|
Digester content |
14.825 |
m³ |
|
Dwell time |
30 |
days |
|
Organic load |
8,56 |
kg OS/m³/day |
Site Parameters
|
– Total Energetic power 24/7 |
18,6 |
MW |
|
– Electric power 24/7 |
3,9 |
MWe |
|
– Biomass (annualized) |
90.000 |
ton |
|
– Organic Mineral Grains (annualized) |
19.911 |
ton |
|
– Gross margin (annualized) |
7.765.036 |
EUR |
|
– Range “Green Power” for families |
11.386 |
families |
Aerials
Location: MVB Oijen BV, Parallelstraat 3, Oijen, The Netherlands