MBV Oijen BV

Plant 4

MVB Oijen BV, Netherlands

  • Acquisition of MVB Oijen BV
  • Location: Oijen, Netherlands (near Oss, Brabant)
  • Capacity: 100,000 tons
  • 9 MWe to start in 2023

Electricity off-take

3.9 MW ; total energetic power 24/7: 18.6 MW

Heat off-take

0 MW (no CHP – Combined Heat and Power facility)

Feedstock

Currently 72,000 tons; 100,000 tons requested of feedstock

Planning Permission

Permits granted

Grid connection

Dutch gas network

Site

Oijen (NL) [near Oss (NL)], agricultural zoning

Commission

Starting 2023

Technical Facility Data

PRODUCT

Mass (tons/day)

Mass (tons/year)

% Share Nutrition

Biomass – Solid

173

63.000

34%

Biomass – Liquid

0

0

0%

Manure – Solid

0

0

0%

Manure – Liquid

74

27.000

15%

Internal Return (Thin Fraction)

255

 

51%

Total Fermenter Input

502

90.000

100%

Required Digestion Volume and Digesters

Digester diameter

22,0

m

Liquid height

7,8

m

Number of digestors

5,0

#

Digester content

14.825

Dwell time

30

days

Organic load

8,56

kg OS/m³/day

 

Site Parameters

   – Total Energetic power 24/7

18,6

MW

   – Electric power 24/7

3,9

MWe

   – Biomass (annualized)

90.000

ton

   – Organic Mineral Grains (annualized)

19.911

ton

   – Gross margin (annualized)

7.765.036

EUR

   – Range “Green Power” for families

11.386

families

Aerials

Location: MVB Oijen BV, Parallelstraat 3, Oijen, The Netherlands

MVB Oijen BV