ABR Productions BV
Plant 2
ABR Productions BV
- Expansion, upgrade of site
- Location: Oelegem, Belgium
- Now 2.1 MWe
- Capacity 25.000 ton, potential later capacity expansion to 60.000 ton (pending authorization)
Electricity off-take |
2.1 MWe |
Heat off-take |
4.1 MW |
Feedstock |
25,000 tons feedstock |
Planning Permission |
The permit has been granted: ABR Energy Permit: GPBV-code: BE.VL.000001221.INSTALLATION |
Grid connection |
15 kV as of March 2009 |
Site |
Ginnegemveld 2, 2520 Oelegem – Ranst (B), Agricultural zoning |
Commission |
Upgrade effective March 2022 |
Technical Facility Data
PRODUCT |
Mass (tons/day) |
Mass (tons/year) |
% Share Nutrition |
Biomass – Solid |
46 |
16.750 |
33% |
Biomass – Liquid |
0 |
0 |
0% |
Manure – Solid |
0 |
0 |
0% |
Manure – Liquid |
23 |
8.250 |
16% |
Internal Return (Thin Fraction) |
70 |
|
51% |
Total Fermenter Input |
138 |
25.000 |
100% |
Required Digestion Volume And Digesters
Digester diameter |
26,0 |
m |
Liquid height |
5,0 |
m |
Number of digesters |
2,0 |
# |
Digester content |
5.309 |
m³ |
Dwell time |
38 |
days |
Organic load |
6,45 |
kg OS/m³/day |
Site Parameters
Electric power 24/7 |
2,1 |
MWe |
Biomass (annualized) |
25.000 |
ton |
Organic Mineral Grains (annualized) |
5.415 |
ton |
Gross margin (annualized) |
3.324.390 |
EUR |
Range “Green Power” for families |
4.061 |
families |